Archie Frangoudis wrote:
A friend is at about the halfway point in the construction of a Wag-Aero
2+2.
Plan is to install a turbo 13b. Appears to have enough room for two engines
in there. Would appreciate any comments.
Archie
Don't put two rotaries in there but do have him think through what
he is going to do for the cooling system. Have him build the elevator
control with that in mind.
BTW a high wing will not benifit as much from the P51 configuration
as the scoop will not be in a high pressure area below the wing
as it is in the 51.
You still need a long inlet duct and a long outlet duct which
rules out a cowling location for the rad. That still leaves the aft
fuselage. A side intake might work as well as one on the bottom
so the rad could be mounted above the elevator control push/pull
tube. Don't forget the intake boundry layer bypass.
Air could come out both sides of the fueslage or, better yet, a hole
beneath the elevator in front of the lower rudder. The extreme aft
fuselage would then act as a natural exit duct.
This is your basic and best tool for doing cooling duct developement.
manomete.gif
Paul Lamar