Paul Yaw wrote:
Paul wrote:
David Carter wrote:
Paul Yaw wrote:
Hi there,
That amount of time does not sound unreasonable at all, especially if
you do not have a hot tank for parts cleaning. There are two absolutes
when rebuilding an engine. The parts can not be too clean, and the side
housings can not be too flat. If you build the engine yourself PLEASE
replace ALL seals, both rotor housings, and have the side housings
resurfaced. Just do it right, and you will probably never have to mess
with it again.
Paul Yaw
David Carter askes:
Paul Yaw, did you really mean "replace both rotor housings" - regardless of
how they look? I thought you measured the housings and replaced only if out
of tolerance. ???
David Carter
Since new rotor housings are about $350 each its not that much more
at about $700 each for Racing Beat peripheral port modified
new housings :-) You can build them your self if you take a course
in machine shop at the local night school and use their lathe
and mill.
Paul Lamar
Any engine that needs to come apart needs new rotor housings. The only
exception is a race engine which may come apart on a regular basis for
inspection. If the engine is in need of a rebuild, the rotor housings
have been garbage for a long time already. You will notice that they
all develop a small groove on the edges. The apex seal will have a
corresponding high spot, and so they fit together OK. If you put new
apex seals up against these old rotor housings, they will probably seal
worse than the old ones.
So, if you decide that the apex seals, and
rotor housings can be re-used, you are still screwing yourself. Let's
say for instance that you tear the engine down for a freshen up, at
50,000 miles. If it was well taken care of, the internals will probably
look quite good, which basically means that the engine should not have
been taken apart in the first place. But just for the sake of argument,
lets say that new rotor housings are good for 100,000 miles. If you put
the engine back together with the old housings, you have a 50,000 mile
engine.
So what is the point of building a 50,000 mile engine? This is
all just a long drawn out way of saying that if the engine needs a
rebuild because of excess oil consumption, low compression, or a water
leak, both housings are garbage. They wear quicker than the apex
seals. Mazda has what they call "rebuild" specs which are quite
different from what you would see in a new engine. What a bunch of BS.
about the only thing that can be re-used in a rotary engine is the
eccentric shaft, the rotors, the side housings if they are resurfaced,
and in many cases the stationary gears. These pieces show almost no
wear if the engine has been treated well, and besides, when was the last
time that someone had to rebuild their engine because the shaft, rotor,
or stationary gear broke?
Total cost for ALL new seals, new rotor
housings, and side housing resurfacing is about $1800. An engine built
properly will run at least 150,000 miles which works out to about 1.2
cents per mile. Re-using a bunch of parts that are within Mazda
"rebuild" specs will give you 50,000 if you are lucky. Most engines
rebuilt in this manner don't even last 30,000. Unfortunately the large
crowd of dipshit rebuilders that re-use garbage parts have promoted this
type of "rebuild"
Whew, I really got off on a rant there! The short story is that used
parts have already used up a good portion of their life span, so why
build an engine that is already half used up. If you have never rebuilt
a rotary, it will take you a long time. Why spend that time for
something that will not last long? If you have me build your engine,
you have no choice but to use all new parts because I refuse to build an
engine that is half dead when it leaves the engine stand. In other
words, If I rebuild your engine, I am going to put $1,100 dollars in my
pocket for labor. I will not take $1,100 dollars from you for
performing meticulous work on a bunch of garbage parts, and you wouldn't
want me to. Don't shortchange yourself.
I'm sorry if this sounds so abrasive. I have to explain to people on a
regular basis why my price is twice what Joe Schmo wants for a rebuild.
In many cases I recommend that if the customer wants to save money, that
they spend the $2000 on new parts and do it themselves rather than give
it to Jo Schmo who will assemble the engine from floor sweepings for the
same amount.
PY
Here here! Right on Paul Yaw!
Paul Lamar
The Aircraft Rotary Engine Newsletter. Powered by Linux.
http://home.earthlink.net/~rotaryeng/ http://www.linux.org