Vance Jaqua wrote:
--- Paul <rotaryeng@earthlink.net> wrote:
I cut the pitch change yoke down so no hand
clearanceing will be necessary.
This is about the simplest and easiest to make
constant speed prop
hub I have come up with so far. Thanks Vance for
that suggestion.
I will work on the part drawings soon. I also need
to do a few stress
checks.
Paul Lamar
Should work - tho I liked the loading hole offset from
the race, and the shank to take some of the torque,
and seal the guts - Vance
I could not figure a way to put it together. The yoke has to go
in before the shanks so there was no way to offset the holes.
I hope the screw is hard enough to match the hardness of the race.
I will recommend hardening the screw separately after it is machined
with the outer housing. Each screw will then be matched to its
original position by a trial assembly.
Also in your design you had a collar around the shank outboard of
the bearings. I felt this might bind if the blade was subjected to
any bending loads. I think it needs a little clearance in that area so it can
take up a position solely controlled by the combination of
the really high axial tension loads (due to centrifugal force) and whatever
bending loads are present. I think the guts can be sealed well enough
with some RTV. Once the prop starts spinning any water in there is coming
out.
Paul Lamar
The Aircraft Rotary Engine Newsletter. Powered by Linux.
http://home.earthlink.net/~rotaryeng/ http://www.linux.org