No, No, No.......
Everything that has to do with length is stock 20b material, it is that the
iron housings and rotors that are the same......Plus a little more. No
extreme machining required. You will still have to plunk down the $750.00 for
the 20b E-Shaft and another $300.00 for the primary iron housing to make a
20B. The use of 13bREW parts can save up to $2000.00 in building costs.
Bruce Turrentine
The Aircraft Rotary Engine Newsletter. Powered by Linux.
http://home.earthlink.net/~rotaryeng/ http://www.linux.org