Jim, this end housing scheme with out the tension bolts
would work well with the modified flanged rotor housings.
Save weight too as all housings would be alloy.
The steel wear plates could then be enlarged to serve as bolt
flanges with the Max Bentele bolt scheme on page 205 of
the Norbye book.
Mazda ought to give you some money to try this out.
I would if I were them :-) Might even save some production cost
if the dozens of small bolts required could be installed
by a robot and the alloy water jackets die cast.
Maybe I should do an overall drawing of this idea.
Paul Lamar
The AirCraft Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://home.earthlink.net/~rotaryeng/ http://www.linux.org