OK here is what I recommend. The 4130 rectangular steel tubing is
now use to distribute the tension load into the two
original hard points. The new lower hard point adjacent to the
lower longeron that Bill is modifying will take the lower
compression strut load. Just like Perry's original set up.
This should work fine and give plenty of room around
the right side of the engine for exhaust, intake and water plumbing.
The triangles should be braced on both sides either to the first
wing rib or forward diagonally to the spar. Your choice. There is very
little side load so this is mainly a stiffness issue so 1/4 ball
jointed 1/2 inch diameter struts could be used.
Underneath the pan and between the rubber mounts there will be plenty
of room for a 12 inch wide radiator. No diagonal tubes. The pan is
not shown but a custom aluminum pan is recommended but not required.
The front mount is not shown but any one of a number of schemes will
work as there is little or no load. The rubber bushing shown are on
or near the CG of the engine/psru/starter/alternator/prop combination.
I recommend welding something on to the front panel of the pan for
a front mount.
Paul Lamar
The AirCraft Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://home.earthlink.net/~rotaryeng/ http://www.linux.org