Subject: 93 UP manifold hold down bolt.
From: ACRE NL
Date: 3/23/2002, 8:55 AM

BTW guys this prototype casting is a bit rough looking. The final castings
will have a much better finish.

Here is how its done. The hole in the outer wall of the runner is
just large enough to get the bolt in there and tightened with
an Allen or hex socket head  wrench. Then an aluminum plug is 
screwed into the taped hole to seal it.

Paul Lamar
 
The AirCraft Rotary Engine NewsLetter.              Powered by Linux.
ACRE NL web site.
http://home.earthlink.net/~rotaryeng/            http://www.linux.org

Casting5F2.JPG