| Subject: 93 UP manifold hold down bolt. |
| From: ACRE NL |
| Date: 3/23/2002, 8:55 AM |
BTW guys this prototype casting is a bit rough looking. The final castings will have a much better finish. Here is how its done. The hole in the outer wall of the runner is just large enough to get the bolt in there and tightened with an Allen or hex socket head wrench. Then an aluminum plug is screwed into the taped hole to seal it. Paul Lamar The AirCraft Rotary Engine NewsLetter. Powered by Linux. ACRE NL web site. http://home.earthlink.net/~rotaryeng/ http://www.linux.org
