Rick Girard wrote:
Paul, Are all the castings for the manifold accounted for or is the
total of the
production run still to be determined? I don't need the machining,
just the raw casting.
Rick Girard
13B + LEZ
Too soon to say. We will be doing 20 the first batch. How many want just
castings?
Paul Lamar
Joseph Berki wrote:
Are you taking orders for manifolds? Need more info. Thanks
Joe Berki
Limo EZ--
Not yet Joe. Tracy will be selling them and sending them out as soon
as I can send him a batch. What else would you like to know?
We don't know the exact weight yet as we are thinking of pocketing
some unneeded metal in the machining process. How much more would you
spend to get a pound out? :-) BTW there will be enough metal over
the rotor housing water ports plumbing for those that want to run a water
cooled turbocharger. This will fit the late 13B (93 and later) with
special order machining.
Paul Lamar
I would like to get in on the first batch. I can live with an extra pound
if it saves a hundred bucks worth of machining. I'll be hogging out enough
metal just to fit the six port motor.
You mean us on the west coast get to pay for shipping from the west coast
to Florida and back to the west coast? {:-o
Mike
Mike McGee, RV-4 N996RV, O320-E2G, Aurora, OR
13B in gestation mode
I am afraid so. I hate shipping :-)
Paul Lamar
The AirCraft Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. Copyright 1998-2002 All world wide rights reserved.
http://home.earthlink.net/~rotaryeng/ http://www.linux.org