Subject: eng. mt center bottom hard point
From: ACRE NL
Date: 2/11/2003, 8:01 AM


Jerry Hey wrote:

Paul,  the tube marked with duct tape is intended to transfer bending
loads imposed by the engine mount back to the heavy cluster that is
the strongest point in the TW fuselage.    The two cross tubes that
are circled (one fuselage and one eng. mt)  would have flanges that
are bolted together.  That point is where the two lower engine mount
tubes  ( red lines)  tie in.  What do  you think?   Jerry

That will work fine Jerry. The tubing walls need not be any greater
than .035 as the loads are very low.

Paul Lamar

One other thing Jerry. Make sure you integrate that bolted joint into
the metal firewall wall. That will stabilize the joint in the vertical
plane. As shown it will tend to force the middle of the cross tubes 
downward in a hard landing. Not much but but  better to be safe than 
sorry as it adds no weight.

Paul Lamar
 
The AirCraft Rotary Engine NewsLetter.  Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/            
Copyright 1998-2002 All world wide rights reserved.