Edward Klepeis wrote:
Dear Joe
For what it is worth may I make a few suggestion on building a muffler
from scrach
1. when you fit up seams in .040 mat. make sure they are tight
together the tighter the better the weld finish job will be.
2. if you are
rolling a piece of mat. to make the muffler body bend the edges in a little
bit on both sides before rolling that way it will be more round it will
not have flat spots left in it by the roller not being able to curve the
last 1'' of the mat.
3. For welding wire use the approved type of mig.
welding wire. The reason being you can get it in small spools of .040.
it is easyer to weld .040 with .040 than say 1/16'' the larger wire cools
the welding puddle down too fast and you deposit too much mat.
4. clean off
all cutting burrs and sharp edges. When you cut mat. with a cut off wheel
or bandsaw you have contaminations to deal with.clean then up.Remember
you are tig welding .040 mat you do not have that much of a chance to go
back and do it right the second time and it's very easy to blow a hole
in the mat If I can be of help with suggestions or ideas give me a
call or email me and I will try to help you out 270 898 3776 shop
Regards Ed techwelding@comcast.net
Thanks for the welding and fabrication tips Ed.
Ed, did you get the 4" dia. by 4.5" long drawn cans from Zero for my water rez?
Also please set your line length word wrap to 65.
Paul Lamar
The AirCraft Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/
Copyright 1998-2003 All world wide rights reserved.