Jerry Hey wrote:
A month ago I posted a jpeg of the prototype p port throttle
body. The
main criticism was that the butterfly was the same size as the
port:
i.e. 1.5 inch. Since the butterfly somewhat blocks the passage,
it had
to be made larger to allow for enough flow. It was recommended
that
the butterfly be enlarged to 1.625 in. This we have done. We
also
added a throttle stop so that idle can be set. And we
reengineered the
attachment of the butterfly control arm so that it cannot
accidentally
come off the shaft. The shaft turns in bearings and is silky
smooth.
In the first photo the little tube is a pressure tap required
by the
EC2. The long screw is the throttle stop. At its base, hardly
visible
is a nut that locks it in position. The screw sticking out
of the
control arm contacts the bolt to set the idle. The second
photo
shows the butterfly axle and the bearing which is retained by
the
little screws. The third photo shows the butterfly from the
intake
side. You may be able to see that the bore is tapering down to
the
butterfly (1.625 in) It starts out at 1.75 i.d. to match the
bore of
the manifold tube. The last photo is from the perspective of
the
rotor. In this view the bore is tapering down from the
butterfly to
the 1.5 exit. Note the thick (.375 in) walls. This is material
for
the die grinder, if you want to experiment. . Our port is
sized to
run great up to 8000 rpm so you may not want to touch it at
all.
-- Phil Flaugher wrote:
Beautiful! Hope they are affordable (always relative, isn't it?)
when my time for them comes.....
Congratulations on being a "doer". Seems like everything you touch
has practical application....
Phil
Thank you Phil, I had a hand in building the prototype but quickly
reached the point where a real machinist was needed. I have not
determined price yet. Keep in mind there will be other expenses along
the way. The housing will have to be bored, the insert epoxied in
place and blended with the housing. An intake manifold will be
needed. However, the throttle body was the big deal, now that it is
a reality the rest should come together in a few months. Jerry
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/
Copyright 1998-2004 All world wide rights reserved.