Subject: S Beam mt completed
From: ACRE
Date: 8/17/2004, 5:15 AM


       In the last  two photos a  piece of all-thread through the Barry Mt
     > and a chunk of old hat section  are used as fixture to position the
     > Setrabs.  I can adust them vertically and pivot on the all thread.  At
     > first glance it looks as if the oil coolers will fit where I wanted
     > o.k.   Air will be ducted from the cheek inlets  through the coolers
     > and then out through louvers on the side,   maybe.  Still thinking
     > about that one.
     >
     > For those who would like to build their own S beam engine mount,  I can
     > supply the S Beam with the bushings welded in and the Barry Mounts
     > installed.     And I can also supply  complete  engine mounts.   Jerry

Looks like very nice work Jerry.

Bill Jepson


 
The Rotary Engine NewsLetter.  Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/            
Copyright 1998-2004 All world wide rights reserved.