Charlie Smith wrote:
I visited ATP about two years ago and despite writing them a month in
advance, they were not at all prepated to receive my visit. I came to
discuss their data; specifically fuel consumption versus aircraft
performance. They claimed to have data but that the power plant was
undergoing "a major redesign that would make existing data useless".
Chuck
Nearhoof absolutely refused several direct requests to view his steady
state
data collected in his RV testbed. I did accept their offer to tour
their
machine shop and test bay. When walking through the shop on the way
back
>from the test cell I noticed some equipment sitting in a corner under
some
plastic. When I asked Chuck what was under the plastic, he replied it
was a
dyno.
Next question- Then you have tested this engine on a dyno?
Reply- No. This dyno is set up for a piston engine. An engine which
produces power in pulses. We need a dyno that is suitable for an
electric
engine. Power that is produced smoothly and continuously. Results
from
that dyno would not be valid.
My conclusion- Get out the hip-waders. They have tested and couldn't
possibly believe the results.
If it were possible, I would ask for reimbursement from ATP for my gas
money
to visit them. A great concept backed by lousy execution and even
worse
business practices. I intend to aviod them at all costs.
Charlie Smith
KIS Cruiser 4021
Thanks for the info on ATP and the turbine engine situation. Another
thing builders should be aware of (that none of the vendors are going to
mention, if THEY are aware!) is that a person who wishes to certificate an
experimental aircraft with a turbine powerplant MUST have an approved
maintenance program for the engine and aircraft BEFORE the airworthiness
certificate can be issued. This maintenance program must be approved by the
FAA Flight Standards District Office (FSDO). This approval process could
take several months to complete, so the builder had better start early so as
to have the approval in hand when the aircraft is inspected.
Further, not only does the aircraft need an approved maintenance program,
but the pilot who flies the aircraft must have a specific letter of
authorization (LOA) in order to legally fly the turbine-powered homebuilt.
So it's back to the FSDO again!
Food for thought when considering a turbine engine for a homebuilt.
Joe
Is this in the FAR's?
Greg Ricters flying jet cozy did not require this.
Eric Ruttan
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/
Copyright 1998-2004 All world wide rights reserved.