Subject: Preparing for the S Beam Motor mount
From: ACRE
Date: 8/19/2004, 6:33 PM

Jerry Hey wrote:

A number of people have shown interest in having a Schertz Beam Engine Mount. The process on my end starts with setting up the hard points from your firewall on my fixture so that the engine mount when you receive it, fits. I can come close, but often some weld warpage creeps in which makes the fit to the firewall less than ideal.

The way to avoid this problem entirely and end up with a perfect fit, is to not prepare your firewall hard points until after you receive the engine mount from me. Use it as a template and micro adjust the position of your hard points accordingly.

This is easy to do on tube aircraft and also on any aircraft with a plywood firewall. I haven't any experience with sheet metal construction, but I am sure that tiny adjustments can be made at the time of construction. Just hold off on drilling and riveting the corner structures.

Thanks, Jerry

 
The Rotary Engine NewsLetter.  Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/            
Copyright 1998-2004 All world wide rights reserved.