Spoke to the guys at the shop today. We worked out some details.
We are building a prototype of the slide throttle and the P-port bored rotor
housings. We will have them at Sun & Fun in the engine workshop area.
Since the slide throttle goes along with the P-port we will offer
the machined rotor housings for P-ports as well. No idea on the price yet
but somebody will have to order a minimum of ten. You can send your rotor
housings and when we get ten we will machine them and ship them back. You
supply the rotor housings. They will be bored on NC machine tools.
We are also looking for somebody to retail these parts.
If you are interested in doing that send me email marked private.
We have no intention of retailing these parts.
We will place your name and company info on our web site as a
suppler of these parts.
Paul Lamar
Paul,
Will the different expansion rates of the slide valve body vs. the rotor housings/center housing cause the slide valve to deflect or loosen?
Ken Powell
That side of the engine is rather cold. Given the coef. of thermal expansion
being as low as it is I don't anticipate any problem of that kind. The slide
throttle body will be close to the temp of the rotor housing due to the excellent
heat transfer of the aluminum parts anyway.
BTW If somebody is ready to build, buy or overhaul an engine and you are willing to
send it to Mazdatrix for over haul I will bore the rotor housings,
add the slide throttle and build the rest of the simple manifold for free.
I will then test it on the Mazdatrix dyno for free. You will also need to
supply the ignition, four injector holders, two 180 degree 2 inch diameter tubing
bends and bell mouths and the fuel injectors along with Tracy's computer.
Perry Mick has been flying a Mazdatrix overhauled engine for
several years now. You won't need a gear box just yet as the Mazdatrix
dyno can't test it anyway.
We can also machine bell mouths if we get an order for at least ten sets
or twenty bell mouths. We can also tig weld the bell mouths and SDS injector
holders to the tubing anywhere along its length you choose.
We will supply kits so you will be required to bond in the tubing
inserts into the rotor housing and bolt together the slide throttle.
BTW here are some pictures of some of the shop equipment.
There is a lot more equipment I don't have pictures of just
yet. The NC mill is a big one so bored rotor
housing are a piece of cake. I expect it will take less than
five minutes to bore a rotor housing once the NC program is
written.
Paul Lamar
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://home.earthlink.net/~rotaryeng/
Copyright 1998-2004 All world wide rights reserved.