The JB Weld is cheap. Potting it after boring makes a mess as the potting
compounds leaks out around the tube and gets inside the bore and sometimes
on the chrome wear surface. Bad news. It also damps the vibration of the
cutting tools making for a smoother bore.
Paul Lamar
I think this is overstating the difficulty of pouring after boring.
When I did mine it was a smooth easy operation with NONE of the
difficulties listed above. My method allowed the insert to be keyed in
place by the epoxy which I prefer greatly over superficial surface to
surface bonding Jerry
3,000 psi is not "superficial surface to surface bonding" :)
As I said it adds up to 18,000 pounds.
You could always do a static load test if you don't believe me.
Take two pieces of telescopic aluminum tube and bond them together
overlapping only one inch. That would give you a bonding shear area
of 6.28 square inches. 6.28 X 3,000 psi is 18,840 pounds.
The .065 wall 2" OD aluminum tube would have a cross sectional area
of about .4 square inches. At 18,840 pounds that would be a tensile
stress in the aluminum of 47,000 psi. The aluminum tube probably would
fail in tension before the bond let go.
An engine host would not be strong enough to pick up enough weight
to test this bond.
Go to any hardware store and pick up any package of two part
epoxy and read the label.
3,000 psi! Amazing but true.
It is not carbon fiber that holds composites together. It is the epoxy.
BTW JB Weld is available in large tooth paste tube sized industrial packaging.
Paul Lamar
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Copyright 1998-2005 All world wide rights reserved.