Speaking of the S-Beam, a word of caution & a question.
On the caution front, I tore down the S-Beam to bead-blast it before
priming & discovered significant amounts of cutting fluid wicked
beneath
the mounting blocks. My presumption is that the local rework of the
SBeam is the source of this fluid. In any case, I'm sure it would not
have done good things for the rubber Barry mounts if not caught &
cleaned up. Folks who are getting this rework done for them should
either remove the mounting blocks beforehand themselves, or check
afterward.
On the question side -- I did not pay enough attention when tearing
down
the SBeam. I cannot remember whether the rubber mounts are installed
male-side up from the bottom, or male side down from the top.
Logically, it seems like male-side up from the bottom makes the most
sense. Jerry/Paul -- which way is right??
Mark
Male side up sounds right.
Paul Lamar
One more question -- we need a 10mm bolt like the ones Tracy provides,
only 1" longer than his long ones. The bolt heads are marked 8.8.
Mounting the starter using the mounting plate means we need an extra
long bolt. Any idea where to get these bolts?
Mark & Mark
8.8 is medium strength. Grade 5 McMaster Carr up to 7 inches (180 mm)
long in 10 mm increments. 12.9 better than grade 8 up to 120 mm in length
expensive. About $9 each.