Subject: Dimensions for rotor housings and center housing?
From: Rotary Engine
Date: 11/10/2006, 4:50 PM
To: AA-me


>> I am about to have the machine shop produce a
prototype slide
>> throttle.
>> I want to be absolutely sure that it will fit.
>> I need to check the center to center dimensions
of the rotor and
>> center
>> housings on the 1988 to 1991 13B engine.
Specifically, I need to
>> check
>> the distance between the two rotor housings,
center to center, in
>> an
>> assembled engine at about where the p-port
openings would be.
>>
>> Could someone get these dimensions for me?
Measurements from
>> different
>> engines would be good. Either metric or US units
are OK.
>>
>> Thanks in advance.
>>
>> Doc Custer
>> Retired software engineer and sometime
Audiologist
>> Building RV9-A. Fuselage
>
>
> Doc,
> I have a 1988 four port and a 1985/86 six port.
I'll check the
> dimensions tomorrow morning.
>
> Aubrey

Great! I look forward to the data. Thanks Aubrey.

Doc Custer
Retired software engineer and sometime Audiologist
Building RV9-A. Fuselage




I measured a 1989 6 port 13b and it is 5 1/8" c-c
which  pretty much confirms the 5.108" depicted on
Paul Lamars drg.
Another 6 port 1991 engine that I fly uses the same
gasket so the dimensions are the same equal to the
exhaust and intake stud to stud dim.

John Prendergast


Some engines are overhauled and a few thousands of an
inch are taken off the center housings width changing the p-port
center to center distance. Then you have the tolerances
of boring the holes in the center of the 80 mm wide
rotor housings.

You will do well coming out about /- .01" on the
slide throttle center to center distance. Usually
there is that much slop in the parts.

I would use the back plate of the slide throttle as
a jig when bonding in the tubes and tack welding the
flanges. It would be nice Doc if you were a one
stop for the whole thing. People could send you
their rotor housings for boring. You could then control
the dimensions.


Paul Lamar ...No rotor no motor.


I have been out of town the past two days so I haven't had access to
my email. Wife had surgery on her foot. AOK. That is the good news.
The bad news is that I am going to have to have my left hip replaced
with a titanium one. Probably in December.

I am going to try to get the slide throttle moving before surgery.

Doc Custer
Retired software engineer and sometime Audiologist
Building RV9-A. Fuselage



The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://www.rotaryeng.net
Copyright 1998-2006 All world wide rights reserved.