I am all for the bell housing being done first. We have needed one
of those for the last ten years. We also need to figure a way
of locking the input shaft seal in from the back side.
IMHO Tracy does it this way to provide support for the helical gear
thrust bearing. Here is a dwg of the plate looking at it from
the back side. The seal is pressed in from the back side of the plate.
Apparently there is very little room before the input shaft spline.
The seal seems to be working out of the bore for whatever reason. Maybe
high pressure in the gear box.
BTW while we are at it we could put in a torque meter that would measure
the helical gear thrust. There would be more room if there was
another way of attaching the helical gear to the input shaft instead
of a pin. Perhaps it could be broached and silver soldered to
a spline on the input shaft.
Paul Lamar ...No rotor no motor.
Why not put in a strain gage? Takes up almost no space. My son found one for
$200, and it includes a meter.
Doc Custer
Retired Software Engineer and sometime Audiologist
Is it a torque meter type? Is it new? Got a picture?
--
Paul Lamar ...No rotor no motor.
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Copyright 1998-2006 All world wide rights reserved.