Paul,
The first 2 bell housings for testing finished op 2 this morning.
Pictures attached. The stress test will be next and then I will start
cutting some weight out of them using the stress test setup for
validation. There are a few design changes I will make for the
production parts. The first being a better match to the starter shape
(need a larger radius)
and to incorporate the cutouts I put in.
I have a RD1-B Gear drive here, but I need to get my hands on a RD1-C to
finalize some issues. I will contact Tracy in the morning.
Larry
P.S. I finally found a carb large enough to handle a rotary..... picture
included. Too bad it is as large as the engine......
The bell housings look great Larry. Which bolt hole was off?
they all look right on.
Your kidding us. That carb is off an P&W R2000 :)
Paul Lamar ...No rotor no motor.
Very Nice Larry... Can't wait to get one! Any idea when you will be
ready to start shipping them or what the price will be?
Mike C.
It will be awhile. Larry has to redesign it as Tracy's gear boxes vary.
Some don't fit.
This spacer will be incorporated into the bell housing casting so it
fits all of Tracy's gear boxes. It will be stronger and lighter overall.
Paul Lamar
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Copyright 1998-2006 All world wide rights reserved.