Subject: All there is to the Posa/Ellison low pressure fuel injection
From: Rotary Engine
Date: 12/5/2007, 11:37 AM
To: AARotary Engine

This is it. A few holes drilled in the Teflon slide.
The spacer is done. The slide will be finished today
or tomorrow. I have the pressure reg. and the low pressure
pump. 180 degree 2" runners will be in tomorrow from Burns.
I have the bells. I need a bit of TIG welding on the slide
covers.

It will be on the dyno soon. Maybe not before January.


-- 
Paul Lamar ...No rotor no motor.

The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://www.rotaryeng.net
Copyright 1998-2007 All world wide rights reserved.