This is it. A few holes drilled in the Teflon slide.
The spacer is done. The slide will be finished today
or tomorrow. I have the pressure reg. and the low pressure
pump. 180 degree 2" runners will be in tomorrow from Burns.
I have the bells. I need a bit of TIG welding on the slide
covers.
It will be on the dyno soon. Maybe not before January.
---------------------------------------------
I am getting ready to machine some brass needles for the low press. FI.
I got the 3/16th brass rod in in one day from McMaster. Ordered it in the
morning and got it at my house 85 miles away at 4 PM. Great service.
McMaster has their own delivery truck in the LA area. Not UPS :)
I realized I would not be able to use the angle markings on the taper
slide as they were too close together. As you can see from the area
required chart the taper is way less than one degree. So I calculated
how much I needed to off set a six inch long arm attached to the taper
slide to get the small angles I needed. The needed off sets are
the last column. A dial indicator set up would make this an
easy thing to do.
Here are some charts if somebody wants to make some of these
needles. I'll make several different tapers so when we get it
on the dyno and it is either too rich or too lean over the change
I can change the needle.
I think my trig and arithmetic is right but double check.
Karibian should have his low pressure FI RX8 engine pretty close
to running. Am I going to beat you to it Karibian? :)
Paul Lamar ...No rotor no motor.
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Copyright 1998-2007 All world wide rights reserved.