Thanks for the input. I don't understand the change you are
recommending. I am sure that is my problem and not how you expressed
it. But can you take another shot at describing the modification--just
pretend you are talking to a complete idiot. We can get Paul involved
so that the plans are modified. Jerry
On Sep 17, 2008, at 6:03 PM, Kenny Aron wrote:
Jerry, thanks for the suggestion on the bushings, I was considering
how I would approach that.
Feel free to use me as a reference.
Assuming you take on more 801 mounts, you should consider how to
provide the necessary clearance to the nose gear shelf. At a minimum,
provide some 0.5" spacers. Those of us w/o machine shops don't have
the odds & ends of materials to utilize. The best solution is probably
to move the point where the frame member welds to the mounting bolt
'tube' forward that amount. I ended up spending an hour on a hack-saw
cutting up scrap 1/8" plate to get my spacers.
--Kenny A.
On Wed, Sep 17, 2008 at 4:44 PM, Jerry Hey <jerry@jerryhey.com
<mailto:jerry@jerryhey.com>> wrote:
Kenny, I think I forgot to mention this before but after you get
the strut installed you can make bushings that go on either side
of the rod end out of 1" o.d. x 1/2" i.d. aluminum tube available
at any metal supplier or from ACS. Leave about 1/16" clearance.
This will give a nice finished look to the installation.
Also, may I give your name and contact info to a Ch 801 builder
who is considering an engine mount? Perhaps you already know
him. Name is Kenneth Johnson. Thanks, Jerry
--Kenny A.
http://websites.expercraft.com/kennya/
Sorry guys I am in London using my EeePC so I don't have access to Rhino.
What Kenny needs is four aluminum spacers 1/2 inch thick to move the
mount 1/2 inch forward. This will give him motor mount tube clearance
for a transverse beam on the front side of the firewall.
Paul Lamar
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Youtube key word UTUBPLEASE
Copyright 1998-2008 All world wide rights reserved.