David, attached is a document that outlines the Renesis 6 port intake valve opening timing.
Steve Izett
Glasair SiiRG Renesis 4 port (engine running, still building)
Perth Western Australia
How is it coming Steve? Any late pictures?
Paul Lamar
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Youtube key word UTUBPLEASE
Copyright 1998-2009 All world wide rights reserved.