I have about a day or two of construction before I feel I can start the
registration/inspection process. Anyone out there have any tips for getting through this
process? I've got my forms, need to get with a DAR. I need my Weight/ balance, transponder
calibration, pitot system check, what else?
Brian Trubee
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2009 All world wide rights reserved.