This is going to be one great performer with
a 300 pound 250 HP P-port Mazda rotary turning
a six foot prop. Lots of room in the cowl for
the cooling system.
If anybody knows Bob Barrows email address please forward.
If not please print the pictures and mail them to him.
BTW Bob, check out our latest flyin.
http://www.youtube.com/profile?user=PaulLamar2#p/u/0/dibuqenWcOk
The dimensions shown are all you need if you have Jeff's plate
and a motor mount jig.
I am thinking of welding up a tower for sale that can be used
to hold Jeff's plate in position if you want to build
your own jig out of plywood. This could save you
some time. All you will need to do is set the tower
to the proper height and locate the fire wall hard points
on the plywood. When you are done with the tower
you can sell it to someone else. What does everybody think
about this idea?
Paul Lamar
Paul,
Thank You.
Bob Barrows does not have email access, but I'll forward this for the
Bearhawk Newsletter.
A few questions:
1. Tubing: I'm planning on using 3/4" x 0.049" wall for all tubes. Is
that acceptable?
2. Support mount... what is the size of the short tube?
3. Support mount lip to bottom of Jeff's mount... how much space between
the two?
Tom W
The two lower diagonal tubes, one on each side, should be one inch OD .049
wall.
They are critical for buckling. The X under the engine can be 1/2 inch
which will save a bit of weight. You can make them out of 3/4 if you
wish. The rubber bushings are
I was thinking of making the jig support mount out of 2 inch
OD .065 wall and 1 7/8 OD for the sliding inner tube.
Telescopic in other words. 3 inch angle iron
on top for bolting on Jeff's plate.
Just put the Barry rubber bushings in there for tack welding
and take them out for finish welding. That will locate the welding
cups in the proper place. I should have welding cups ready for shipping
next week. They will cost about $20 each.
Paul Lamar
I e-mailed this idea to you a week or so ago but I guess it bounced as you
never replied and you're usually pretty quick.
My question to you was is there any value in making an allowance in a MM jig
for left / right offset as well as down thrust ? Are all Scherz beam and Jeff
plates a standard 29" ? Should I build the jig 4' x 4' or would 3' x 4' be
sufficient ? Any idea's on the STOL King mount ?
Thanks,
John
Jeff's plate is 21.5 center to center.
The big question on any new mount is where is the center of the spinner
hole in the cowl? The prop flange must come out in the center of that
hole. Is the cowl hole on the center line of the airplane or is it offset?
If it is on the center line of the airplane than that becomes the
pivot point for the engine off set angle. That is why I ask people
to set up their cowl in the corner of a room and measure it.
Unfortunately the vast majority of kit plane sellers do not
provide engineering dwgs. We must reverse engineer everything.
I have received nothing of any use while designing motor mounts
on the STOL King. I am not paying them $17 for their info pack.
At that rate they don't need to sell actual kits :)
You make up a bunch of fantastic specification and then you charge
people for the advertising literature :)
Paul Lamar
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2009 All world wide rights reserved.