Subject: building cowl molds from step files
From: Rotary Engine
Date: 3/6/2010, 6:02 PM
To: AAA Put this in the To box


After you have designed your cowl using a 3D program
how do you go about building it?
Paul Lamar
I load it into my CAM program... after a hr or so of work I take
a USB
chip out to the shop. Load it into my machine.. hit "Cycle
Start" and
magically... several hrs later there is a cowl there :)..
Ok so there are some additional steps in assembling a foam block
and what not but thats the basics.
I've got a foam block going on it today that is 30" wide x 90"
long and ~30" deep..
will soon be a Cargo Pod mold/buck for a Super Cub.
Jarrett
We should all be so lucky :)
Paul Lamar
I don't do just my own projects on it.. it's there to help
others.. :) I've got a website
[still needs to be updated] but shows some of the nesc details.
www.innovention-tech.com
Jarrett
What would you charge for an RV10 cowl buck?
Paul Lamar
Are we talking a one off foam buck over which the fibreglass would
be laid up or a
full buck ready to pull a production mold?
Jarrett
What is the difference? Is it surface finish?
Paul Lamar
Yes and no, on a 'lost foam' buck there would be a foam finish. On a Production mold Buck
there would be polishable surface finishing materials as well as a final surface cut.
Basically the same thing but the surface is recut, smoother and polish/waxable.
Jarrett
OK mold quality. How much?
Paul Lamar.


Paul for a two pc buck [top and bottom] w/ flanges and mold lines finished and ready to wax and pull a production mold your looking at $3-4000. Provided the supplied model is comlete to the degree needed and depending on details on the air intake areas etc. Now that may sound like alot but from that part you'd be able to pull many multiples to ammortize the initial cost.

A 'lost foam' block buck would be less than $1000 [as low as $500 depending on features etc]

All of these bucks would need to be done in multiple parts and then assembled and finished as a final buck. I'm not able to reach the needed 4ft in depth to machine these in one part. Once I get the 5 axis head working.. it would then be easier to do them in one setup, which would make them somewhat cheaper. Assembling multiple bucks to create one major assembly sounds harder than it is, as the mating parts of the bucks can be drilled and self jigging for final assembly.

Fwiw

Jarrett

Does not sound like the economics are there yet. Best to make do
with the stock cowls.


Paul Lamar
-- 