Subject: building cowl molds from step files
From: Rotary Engine
Date: 3/6/2010, 6:45 PM
To: AAA Put this in the To box



 After you have designed your cowl using a 3D program
 how do you go about building it?
 Paul Lamar


 I load it into my CAM program... after a hr or so of work I take
 a USB
 chip out to the shop. Load it into my machine.. hit "Cycle
 Start" and
 magically... several hrs later there is a cowl there :)..
 Ok so there are some additional steps in assembling a foam block
 and what not but thats the basics.
 I've got a foam block going on it today that is 30" wide x 90"
 long and ~30" deep..
 will soon be a Cargo Pod mold/buck for a Super Cub.
 Jarrett


 We should all be so lucky :)
 Paul Lamar
 I don't do just my own projects on it.. it's there to help
 others.. :) I've got a website
 [still needs to be updated] but shows some of the nesc details.
 www.innovention-tech.com
 Jarrett


 What would you charge for an RV10 cowl buck?
 Paul Lamar
 Are we talking a one off foam buck over which the fibreglass would
 be laid up or a
 full buck ready to pull a production mold?
 Jarrett
 What is the difference? Is it surface finish?
 Paul Lamar


 Yes and no, on a 'lost foam' buck there would be a foam finish.
On a Production mold Buck
 there would be polishable surface finishing materials as well as
a final surface cut.
 Basically the same thing but the surface is recut, smoother and
polish/waxable.  Jarrett



 OK mold quality. How much?
 Paul Lamar.


Paul for a two pc buck [top and bottom] w/ flanges and mold lines
finished and ready to
wax and pull a production mold your looking at $3-4000. Provided
the supplied model is
comlete to the degree needed and depending on details on the air
intake areas etc. Now
that may sound like alot but from that part you'd be able to pull
many multiples to
ammortize the initial cost.

A 'lost foam' block buck would be less than $1000 [as low as $500
depending on features etc]

All of these bucks would need to be done in multiple parts and
then assembled and finished
as a final buck. I'm not able to reach the needed 4ft in depth to
machine these in one
part. Once I get the 5 axis head working.. it would then be easier
to do them in one
setup, which would make them somewhat cheaper. Assembling multiple
bucks to create one
major assembly sounds harder than it is, as the mating parts of
the bucks can be drilled
and self jigging for final assembly.

Fwiw

Jarrett

Does not sound like the economics are there yet. Best to make do
with the stock cowls.


Paul Lamar

It may sound steep from an initial outlay stand point but if there was enough interest. I'd be interested in building the complete molds for a rotary install and then 'pulling' cowls and selling them. Building a complete mold for one cowl is not feasible for sure, but if there was 5-10 ppl looking for a cowl w/ internal ducting as a 'kit' per say, that would make sense.

Not sure how many RV10 builders there are out there, looking to go the rotary route?

Jarrett



-- 
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2009 All world wide rights reserved.