Subject: wiggins on the way
From: Rotary Engine
Date: 7/23/2010, 9:16 AM
To: AAA Put this in the To box



 Paul

cut enough pieces for 91 finished units..It will take a while
to move I know but should be completely done in a week..
 jeff


 Here are some more pictures for the new guys that may
 not know what and where a wiggins goes.

 Paul Lamar

Paul,  Jeff,


I would be interested in two or four sets.
What is the ID of the bore?  1.5 inches?

Doug in Japan.



built to spec....ID is 1.385..

jeff

The ID is 1.385"

The design idea is you can epoxy bond it on to 1 3/8 OD tubing or
you can butt tig weld it to 1.50 inch OD tubing.

If you bond it you must use the aluminum conversion treatment
before bonding. I have used JB Weld successfully. I boiled
it in water under pressure. High temp Devcon will also work.

If you get a pin hole leak after bonding it can be plugged
with silicone conformal coating.

Paul Lamar
--
Jeff
 Id like to get some of those as well.  Any Idea how much
they are going to cost?

Mike C.



-- 
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2010 All world wide rights reserved.