Subject: Wiggins order
From: Rotary Engine
Date: 7/24/2010, 9:06 AM
To: AAA Put this in the To box




   Paul

 cut enough pieces for 91 finished units..It will take a while
 to move I know but should be completely done in a week..
   jeff


   Here are some more pictures for the new guys that may
   not know what and where a wiggins goes.

   Paul Lamar

 Paul,  Jeff,


 I would be interested in two or four sets.
 What is the ID of the bore?  1.5 inches?

 Doug in Japan.



 built to spec....ID is 1.385..

 jeff

 The ID is 1.385"

 The design idea is you can epoxy bond it on to 1 3/8 OD tubing or
 you can butt tig weld it to 1.50 inch OD tubing.

 If you bond it you must use the aluminum conversion treatment
 before bonding. I have used JB Weld successfully. I boiled
 it in water under pressure. High temp Devcon will also work.

 If you get a pin hole leak after bonding it can be plugged
 with silicone conformal coating.

 Paul Lamar
 --
 Jeff
   Id like to get some of those as well.  Any Idea how much
 they are going to cost?

 Mike C.

 To All

I will supply all the 5 parts (2 ferrels, 1 sleeve, 2 clamp  half collars),
2 o-rings and  the  hose clamp....for $45 plus shipping. I need to get with
Paul on the type or make of  hose type clamp he recommends.....

jeff

Any good quality hose clamp works. It needs to be safety
wired so it does not fall off. In fact wrapping just safety wire around the
split clamp half collars is as good as anything else.

Paul Lamar

-- 
Jeff,
I will take 2 sets. (Paul, I don't recall you gave out Jeff's email lately).


LMK how to pay you.

Marc Wiese,

When is the last time you looked at the web site? :)
scroll down on the front page to near the bottom.
http://www.rotaryeng.net

Paul Lamar
-- 
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site. http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2010 All world wide rights reserved.