Lots of snips.
To reduce shaft weight and minimize cost would it be practical to shrink
fit
an interior sleeve in the prop shaft end(s) (all parts annealed) and then
bore and thread near the parting line? Will the bolt threads change too
much
after HT and grinding for bearing ID? Or, is it more practical to bore
thicker wall to the ID shape?
Dan F
Jean,
I see your dilemma. You want to reduce part count and eliminate having a
bolt on connection to the planetary gear carrier. Your challenge then is
basically cost and access to the interior boring operations. Usually, but
not always, more modular construction is cheaper in mass production. A
flanged bolt on connection to the planetary set carrier would prove to be
the cheapest way to go. Paul has done an illustration with this concept
before. Actually that is what the Bell 47 does. The internal spline plate
in the photo middle far left bolts to the planetary carrier lower center.
Notice the six bolt holes around the outer side. Another round plate (not
pictured) bolts to the inner circle of the splined plate to catch the
locking nut on the prop shaft that protrudes through. The spline
connection
plate rests against the main 3" ID outer bearing. The three inch shaft
makes up for the fact that the unit is rather short coupled. That is the
distance between the inner bearing and the outer bearing is less than four
inches.
With your gear set of choice, I would consider Dan's above advice, that
is, press in the interior sleeve to carry the bearing after all internal
boring is finished. Putting a small step in that internal bearing seat
area
will insure the sleeve is positioned accurately. Doing it this way the
lathe
operations are pretty straight forward and less expensive.
Cheers
Doug in Japan
Here are some illustrations on the subject.
Paul Lamar
Paul,
Those weren't the illustrations I was thinking about. I believe you have
one that has an internally flanged prop shaft. The bolts screw into the
planet carrier housing.
Doug in Japan
You will have to narrow it down more than that. How about a sketch?
Most of my bolt on flange designs rely on the shear strength
of the bolts. Same as the old Power Sport design. That is where
I got the idea. I figure if it worked for them it will work
for me :) Some types of bolts have enormous strength.
Paul Lamar
Doug
I wasn't very clear on what I had in mind. The insert is intended to
eliminate interior shaft machining - the bolt holes will be partly in the
tube wall (say 1/3 of bolt dia) and 2/3 dia in the insert. The shrink fit
and threads hold the parts together. Then machine the tube outside to
attain wall thickness and bearing journal dia. Will this work? For a 6.5
B single rotor how about 8 .25-24 bolts with 4 locater bushings at each
end?
(larger bolts for a 13 B) :)
Dan F
Dan, f
Perhaps it wasn't your intention but you did give me an idea on how to
make my
prop shaft easier. Thanks for the inspiration. I will now machine a step
into
the inner part of two inch dia. shaft bore and stick the inner bearing
there.
OD of shaft is about 3". Now if I can find a thick, forged tube 6" inch
OD,
with a 2" ID I will have saved a lot of boring (literally) work.
Now for your idea. Can it be done? Sure. Is it a strong joint? Sorry I
don't think so. Bear in mind I am not an expert machinist but through
experience I have found a round pipe or round bar that comes from the
manufacturer is never round. Machining is necessary to get a good fit. For
interference fits, excellent machining holding close tolerances is
mandatory.
As I understand your idea, drilling and tapping holes at the insert/ tube
joint line and expecting it to hold the insert and rotating parts together
is
risky. Even if the insert was welded in you would still have, in effect,
two
man-made fracture lines running longitudinally through each thread. In
effect
there would be a series of short radian threads. The thread loses its
integrity
and it's holding power diminishes in unpredictable manner over time as the
insert micro flexes. The bolts as you mentioned would also have to absorb
torsional forces. Even if the upper bore hole was counter sunk, the
rotating
forces would widen the gap in the joint line weakening the thread even
more.
As you probably know there are rotating engine parts where a bolt appear
to do
double duty. Notice how a clutch plate is attached to the flywheel. Logic
would suggest the bolts are seeing some torsional force but the frictional
footprint of the mating surfaces is so large the torsional forces are
miniscule.
And that is one key to good design. Flat accurate interfaces between the
mating surfaces .
Doug in Japan.
Doug the secret to handling large bar stock is finding a really
big lathe and large drills. Shops with these tools can drill
a 3 inch hole in just a few minutes. Surely there is a ship
yard in Tokyo bay some place.
Paul Lamar
Hi Doug
Look this supplier does have 6"dia aluminum with 2"wall
http://www.vitaneedle.com/aluminum-tube.htm
Jean Prudhomme
Jean,
Thanks, for the info. I have no need for an alumnium tube though since I
already have a cast magnesium bell 47 gear housing, and an inner modified
RX-4 aluminum bell housing. I am just looking to make up the prop shaft.
I found a source for forged round bar 4340 steel, which unless someone
convinces me it is over kill I'll go with it.
Paul I can drill a two inch hole on the lathes I have access to. I have to
do it in stages though starting with a 10mm pilot hole and slow feed.
Doug in Japan
6" aluminum pipe with a 2" wall; from a company called VitaNeedle; which
specializes in needles.
Begs the question "What ya gonna stick with that needle!!!" :) )
brian gochnauer
Search your email program help on how to add a signature
to your email brian,
Paul Lamar
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2010 All world wide rights reserved.