PaulI still work on the mold for aluminum casting and i guess i should be ready
to bring it to the foundry within 1 at 2 weeks,i bring some modifications from
my original design to lower the weight and having a better bolts assembly set
up.One of the mid rib is much wider for the purpose of drilling 2 pasasageway
one for the bearing oil pressure lubrification and the other for the propshaft
mid pressure feeding to operate the constant speed.The opposite rib is for the
oil return passageway.I decide to go for the first without the governor drive
and if we do have good result i can modifies the mold to incorporate the gear
system.you did send me photo on the past regarding the governor kit to be driven
by a pulley .
Jean Prudhomme
--
The Rotary Engine NewsLetter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
Youtube key word PaulLamar2
Copyright 1998-2011 All world wide rights reserved.