This looks real simple. It might be easier than I first thought.
Getting the roll pins out with Jean's bigger hammer goes a long way
towards making this viable.
Paul Lamar
Here is the cut a way.
Paul Lamar
Hi Paul!
I'm ready to cut the integral planet/prop shaft to length and do some
machining. Some of your rhino images show the planet end set inside the
housing about 2 inches. How far should it be set into the shaft?
And how
far should it extend beyond the prop end of the tube housing? For my
Cozy4 I can have the prop flange be 12.5" behind the bell. I have a 12"
long housing tube.
Thanks!
Ed Carver
Hang on Let me send you some dwgs with dimensions.
Did you find and input shaft you want to use?
Paul Lamar
I'm going to try to use the part I saw in your box full of planet parts,
I think it is called the overdrive ring gear shaft. Part #420 slauson.
It fits into the front drum spline tracy uses on his damper plate, the
same one I have and Jean is using.
I want to weld a couple 4130 tubes to it. One for the id of the sun, and
the other for the od of the sun gear. After machining the teeth from the
od of the sun gear, the tube will fit over it. Using tube like this
means I can extend the length to whatever I desire. It also means the
pins used to hold the sun gear from spinning will then need to shear at
4 points instead of two. We can also run an oil seal on the surface of
it and perhaps eliminate the need to use thrust washers on the inside of
the housing for the sun gear.
What do you think?
Ed Carver
Good idea. That way we keep all the gear box parts the same and just
change the input shaft. Our lathes can handle that. Also one is dealing
with only 200 foot pounds of torque.
Paul Lamar
--
The Rotary Engine News Letter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
You Tube key word PaulLamar2
Copyright 1998-2012 All world wide rights reserved.