One must make a fixture to hold the rubber bushing mounts in
alignment. It
consist of a 1.5 inch square 1/8 th wall square tube with holes
for the 1/2
inch bolts. The bolt holes are 21.5 inches apart. Drill on a
drill press
so the holes are vertical.
The captions on the photos explain some other points.
It is best to set it up in the corner of a room so you can get some
horizontal measurement for the center of the prop flange. Sort
of a 3
dimensional square.
The bottom line is; the prop flange must come out in the center
of the
cowling hole. It is very time consuming to modify or make a
new cowl.
This mount allows you to adjust for that.
BTW use AN bolts. These hard ware store bolts are just for initial
set up. Paul Lamar
Looks impressive Paul,
Alex
It is very ridged. With the Teflon rod ends there is NO looseness at all.
ZILCH... NADA ....:)
Wait till use see the RX8 P-port engine I have mounted :) I should have
that done today. Waiting for a set of rubber bushings from Mc Master car.
===============================================================
Order Date
3/29/13
<http://www.mcmaster.com/#order-history/0329WLAMAR>
Ordered By Lamar McMaster-Carr Number 1174050
Line Product Ordered Ships Price Total
1 6309K34
<http://www.mcmaster.com/nav/enter.asp?partnum=6309K34> Versa-Mount
Vibration-Damping Mount, 130 lb Compression Capacity, 1.94" H Overall 2
each today
(from our Chicago warehouse)
8.30
each 16.60
2 6309K35
<http://www.mcmaster.com/nav/enter.asp?partnum=6309K35> Versa-Mount
Vibration-Damping Mount, 240 lb Compression Capacity, 1.94" H Overall 2
each 2 weeks
8.30
each 16.60
3 57145K74
<http://www.mcmaster.com/nav/enter.asp?partnum=57145K74>
==============================================================
We have two durometers to try. Soft and medium.
Paul Lamar
The Rotary Engine News Letter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
You Tube
http://tinyurl.com/beqqxas
Copyright 1998-2013 All world wide rights reserved.