Pictures from Mark Steitle
The rubber PSRU coupler is looking good Mark.
Paul Lamar
Thanks, Bob Darrah did the hard part, I just stood nearby and watched.
I still need to order 12 bolts and purchase some RTV. Note that the
bolt
heads are not accessible once the snubber is fully assembled. I
plan to
tack weld each head to prevent turning when checking torque on the
nuts.
Mark
Good call on the bolts that hold the spline plate to
the front part.
Mark, Why the 12 10 mm holes in the part that bolts to the counter
weight. Won't hurt but a bit strange.
The large holes in the spline plate allows pouring in
liquid RTV around a 1/2 inch ID silicone hose on the 10 mm socket
head screws. A step drill works well to make them bigger.
Paul Lamar
--
Paul,
Six of the 10mm holes were already drilled when I got the parts. Then we
decided to clock the bolts to facilitate assembly, locating them within
the paddles. This resulted in 12 holes, six will be used, the other six
are along for the ride. The six holes in the other part allows
tightening the 6 - 10mm bolts. I made them just large enough to fit an
allen wrench through. If we drill them a bit larger, it will allow the
bolts to fit through the holes too. As it is, the 6 - 10mm bolts must
be installed before injecting the silicone. We can always drill them
larger at a later date.
Mark
The Rotary Engine News Letter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
You Tube
http://tinyurl.com/beqqxas
Copyright 1998-2013 All world wide rights reserved.