Robin need a hand with the gardening?? Neil.
This is the biggest load to be moved in WA, it weighed over 700 tons
with four trucks towing and two pushing it on the gravel, they were
travelling at 4 Km’s per hour on the gravel reaching 6km’s hour on the
bitumen, the distance to the new mine is 230 Km’s they drove up to 15
hours a day taking 6 days to reach their destination (this also included
becoming bogged with four front end loaders having trouble pulling it out)
--
Only dead fish always go with the flow