Subject: Universal motor mount assemble instructions.
From: rotaryeng
Date: 6/26/2014, 11:09 AM
To: AA-1-Me


Here it is Mike Collier as promised.

The dimensions are critical to stuff everything into the rubber bushing bracket.

I like the socket head 1/2 bolt as it is easy to use and an Allen wrench will hold it when tightening the nut on top.

Things must be done in order. The 1/2 inch bolt goes first.
Then the upper link and rod end. When the engine is in proper position for thrust line then trim the lower square tube length and drill it for the 1/4 inch hole.

Install the 5/16 bolt before installing the lower square tube. Drill a large hole in the front of the bracket so a modified  Allen head 5/16 wrench  can be used to hold it.
The dwg shows a  5/16 hex head bolt. Use an Allen here as well.

When everything is installed then drill the rear 1/4 inch bolt hole through the bracket walls and the square tube.

Install the 1/4 inch bolt and tighten.

The essential function of the rear 1/4 inch bolt is the keep the rubber bushing bracket vertical.


It is important to use AN bolts of the correct length. One does not wanted bolt threads bearing on sheet metal.

Paul Lamar

Thanks Paul, I already ordered and received the Rod Ends...and I had the Barry mounts.   I'll need to order the 5/16 Allen head bolts. Any update on the Inner cooler modification?  No real hurry just checking on it.

Mike C

I am thinking a 5/16 th nut plate inside the bracket is the way to go.
Make sure you get a drill head bolt.

I'll get around to that but right now things are getting crazy with ignition
systems. I made the mistake of showing it to some of my hot rod friends :)
They want it bad :) That is a huge market.

Paul Lamar

The Rotary Engine News Letter. Powered by Linux.
 ACRE NL web site. http://www.rotaryeng.net
 You Tube http://tinyurl.com/beqqxas
 Copyright 1998-2014 All world wide rights reserved.