Paul, never mind the installation manual, how did the race go??? Tell
dady now with a few figures!
Neil.
Has not run yet. Hopefully we will get it running today.
Then it is off to the chassis dyno for a few pulls.
Sebring is not until Saturday.
Paul Lamar
Good luck, Paul.
Murry I. Rozansky
I screwed up big time today and wired the 12 volt supply to the output
wire on the optical pick up. The engine would not start of course.
I thought I blew both optical pickups. I did not bring any spares so
it looked like I was all through for this test. Then I also noticed I failed
to connect the ground wires. I made a mistake on the mistake :)
A double mistake of this kind means no mistake at all. Two negatives
make a positive. I did not destroy the pickup after all. It still worked.
Dave and I were working in 90F heat at 100% humidity. A thunder storm
came through about 2 PM. Plus some neighbors got wind of what
was going on and came over to ask a lot questions.
I''l try again tomorrow morning. When I am rested and it is a bit
cooler.
Paul Lamar
The Rotary Engine News Letter. Powered by Linux. ACRE NL web site.
http://www.rotaryeng.net You Tube
http://tinyurl.com/beqqxas
Copyright 1998-2014 All world wide rights reserved.