If we use the big part of the sun gear as a male spline on the female
billet coupling this will greatly simplify the input shaft. This part
of the sun gear is normally ground down and not used.
Still a work in progress.
Paul Lamar
I suspect machining a spiral or helical female spline might be a real
problem. So extended point set screws to the rescue.
This is major simplification and addresses a problem we have had in the
past with the pin joint failing between input shaft and sun gear.
It also does away with one more spline eliminating all back lash from
that source.
Paul Lamar
Paul,
How are you going to ensure that the set screws will seat down between
the teeth on the sun gear ?
I see that the holes for the set screws are parallel with the axis of
the input shaft whereas the teeth are not.
If the set screw tip coincides with the tip of the tooth it will be
virtually useless.
Chris.
I thought about it some more and I am going to cut the teeth off the sun
gear the way we do it now. That will reduce the diameter of the coupling
and the helical gear thrust needle bearings. That will extend the life
of the thrust needle bearings. It will be easier on the oil seal as
well. I'll up load the new 3D's tomorrow.
If this works it will be the first real gear box improvement in 20 years :)
Paul Lamar
Here they are.
-----------------------------------------------------------------------------
This is for the 3.12 version. On the 2.85 the coupling is even smaller.
Get a small bench grinder and mount it on the tool post holder of your
lathe and you can grind the teeth off the part of the sun gear in question.
BTW this torque isolator is not a new idea. It is widely used on off
road motor cycles.
Paul Lamar
Hi Paul,
I put my sun gear in the chuck and used an angle grinder to grind
off the teeth, it is MUCH faster. When the teeth are gone you can finish
off, turning with a
normal cobalt tool.
Cheers Chris. in NZ
Morning Chris.
Now you have two ways to go. You can use the old fashion way and pin it to
a 1.5 inch OD Ford input shaft. Yoiu will need two pins. Then come up
with a female spline
plate to bolt to a rubber coupling.
New way.
Find some one to mill a female billet coupling and use extended point
set screws on the OD of
the sun gear. Much stronger. No spline slop and cheaper overall.
Here are some pictures of the Tracy Crook old way.
The input shaft and the spline plate are cut down Ford auto tranny parts.
Paul Lamar
A good plan is after the coupling is machined but before threading the
holes for the set screws is to get the pieces set up where their final
position will be. Then drill small countersinks for the set screws to
sit in. The angle on the end of the drill that just fits the thread
holes is probably good enough and 1/8" deep. If the coupling is a hand
press fit to keep things centered the countersinks will help prevent any
possible slippage.
Dale Davies
'
The Rotary Engine News Letter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
You Tube
http://tinyurl.com/beqqxas
Copyright 1998-2015 All world wide rights reserved.