This is the proper bolt to use with the main fitting rubber bushing holder.
Button head internal wrenching 3 inch long 1/2 - 13 and castle nut.
Gives the maximize room for the upper link rod ends.
You need top drill the bolt for a cotter key after you install the mount.
We include the bolt and nut now with all the main fittings. You can get
them from
Macmaster Carr if you already have a Uni Mount.
Alex. you are getting them with your new main fittings.
Paul Lamar
The Rotary Engine News Letter. Powered by Linux.
ACRE NL web site.
http://www.rotaryeng.net
You Tube
http://tinyurl.com/beqqxas
Store
http://www.rotarpower.com/#!
Copyright 1998-2015 All world wide rights reserved.