I have been following your TTC project from the time you started working
on it. It is apparent that the machine is ready for the pilot to begin
practicing for this record attempt. As of yet the pilot hasn't even
pulled the nose up and tried a moderate climb. This attempt requires
flight and power management on the edge of the envelope. It would seem
to me that getting the pilot ready for an attempt would take some actual
flight time on the edge of the envelope. Your pilot has demonstrated
beyond any doubt that he is unwilling to do that.
Not enough headwind to fly a demonstration flight is not an excuse I
would expect to hear from the caliber of pilot required for this
mission. In my opinion this record attempt is not going to happen. To
bad, this has the ability to change the worlds conception of aircraft
rotary engines. Sorry to be so blunt but this project needs another
pilot if it is going to be anything other than a pipe dream.
Paul Shamlian
I totally agree with what you are saying. The rotary movement really
needs a test pilot
familiar with the rotary installation to inspect new installation and do
one or
two first test flight. My guess it would be worth a $1000 plus expenses
to the builders.
People are very reluctant to fly their brand new creations for the first
time.
We are going to move the TTC to another airport close by that is surrounded
by large farm fields.
Paul Lamar
The Rotary Engine free News Letter. Powered by Linux. If you want off
the list PLEASE let me know and I will remove you. ACRE NL web
site.
http://www.rotaryeng.net You Tube
http://tinyurl.com/beqqxas
Copyright 1998-2017 All world wide rights reserved.