Subject: STEEL COUPLING WITH FRONT RING GEAR HUB 12
From: paul lamar
Date: 11/25/2017, 8:19 AM
To: A10-Me-Earthlink

12

Good morning paul


i did work an other way to build a coupling by using the hub from the E4D trans front ring gear hub, the other part have to be machined from a steel bar.

The flywheel need to be relocated adjacent to the counterweight and this new part

 and give more space between the flywheel and front plate.

The steel block are hold by rivets and tig welded each side to hold the compression load.

I am sending you some photos when i trimmed on the lathe with cutting wheel and the design.

The rubber blocks are .750" thick.

It might be interesting to the one who want to build it and save some machining by using the splines stell hub.

Just an idea Paul

That cut off grinder mounted on the tool post holder is a wonderful idea. Good work.

Paul Lamar


-----------------------------------------------------------------
Please  add your questions or comments  at the end of the thread.
Not the beginning.

I am going to enforce that rule. If people don't do that it will not be forwarded.
My ISP changed the rules.

The Rotary Engine free News Letter. Powered by Linux. If you want off
the list PLEASE let me know and I will remove  you.  ACRE NL web
site. http://www.rotaryeng.net You Tube http://tinyurl.com/beqqxas
Copyright 1998-2017 All world wide rights reserved.